Mercury MerCruiser Engines Service Manual Number 24 GM V-8 305 CID 350 CID

VELVET DRIVE 5000 SERIES TRANMISSION
SERVICE MANUAL NUMBER 24
Shift Lever Installation
IMPORTANT: Velvet Drive Warranty is jeopardized if the shift lever poppet spring and/
or ball is permanently removed, or if the shift lever is changed in any manner, or repo-
sitioned, or if the linkage between the remote control and the transmission shift lever
does not have sufficient travel in both directions.
Shift lever and related parts must be assembled as shown.
1.
Lubricate poppet  ball, spring  and holes  in shift  lever with Quicksilver  2-4-C Marine
Lubricant.
2.
3.
4.
Install poppet spring and ball. Retain ball by placing shift lever on shaft.
Install flat washer, lockwasher and nut on shaft.
Torque nut to 96-132 lb-in. (11-15 Nm).
d
c
b
a
f
e
73251
a  - Nut
b  - Lockwasher
c  - Flat Washer
d  - Shift Lever
e  - Poppet Ball
f  - Poppet Spring
5.
After installation, move shift  lever through forward, neutral and reverse positions.  No
more than finger-tip effort should be required. If valve binds, cause for binding must be
found and corrected.
Index
Page 8B-22
90-861327--1   OCTOBER 1999
Product Specification
CategoriesMercury MerCruiser Manuals
Tags,
Model Year1998, 1999, 2000, 2001
Download File
Please Enter the Security Characters Shown Below. Letters are Case Sensitive. Your download link will appear upon completing this step.
- 895 pages
Document File TypePDF
CopyrightAttribution Non-commercial
(1 votes, average: 4 out of 4)
Marine readers have rated Mercury MerCruiser Engines Service Manual Number 24 GM V-8 305 CID 350 CID 4.0 out of 4.0 based on 1 product reviews.
Submit your review (optional)
(will not be displayed)
* Required Field

Mercury MerCruiser Engines Service Manual Number 24 GM V-8 305 CID 350 CID SKU UPC Model
Fernando Woll on Dec 09, 2014. Boat Engine

Great performance engine.
Class 1


Leave a Reply

Your email address will not be published. Required fields are marked *

*
*
Website