SERVICE MANUAL NUMBER 28
POWER STEERING
Selection
TIE BAR CHART
For Dual Installations with Steering Cable Attached to Starboard Power Package
*
*
16” to 30”
30” to 46”
92020A1
92020A2
92020A3
46”
to 62”
*
If centerline distance is the same as maximum figure, use next larger size tie bar.
TIE BAR CHART
For Dual Installations with Steering Cable Attached to Port Power Package
*
*
28” to 37-1/2”
37-1/2” to 55”
96708A4
96708A5
96708A6
55”
to 72”
*
If centerline distance is the same as maximum figure, use next larger size tie bar.
Installation
DUAL INSTALLATIONS WITH STEERING CABLE ATTACHED TO STARBOARD POWER PACKAGE
1.
Attach fixed bar end to steering lever, using clevis pin and cotter pin. Spread cotter pin
ends.
b
c
22211
a
d
22079
a - Fixed End
b - Steering Lever
c - Clevis Pin
d - Cotter Pin
2.
Position sterndrive units as desired and turn adjustable end out (if necessary) to align
hole in bar end with holes in steering lever and piston rod end clevis.
3.
4.
Turn adjustable end out 3 to 4 turns from this position.
Apply Loctite 277 to exposed tie bar threads; then turn tie bar back in (3 to 4 turns) to
previously aligned position.
INDEX
90-863160
MAY 2000
Page 6A-35
Product Specification
Categories | Mercury MerCruiser Manuals |
---|---|
Tags | MerCruiser Sterndrives 90-863160 |
Model Year | 1998, 1999, 2000, 2001, 2002, 2003, 2004, 2005, 2006, 2007, 2008, 2009, 2010, 2011 |
Download File |
|
Document File Type | |
Copyright | Attribution Non-commercial |
I could not find any mention of the seawater pump assembly.
Maybe I have the wrong unit