ZF/HURTH TRANSMISSIONS
SERVICE MANUAL NUMBER 30
Shift Cable Installation and Adjustment
IMPORTANT: Ensure that shift lever is positioned approximately 10° aft of vertical as
shown when in the neutral detent position. Also, ensure that the distance between
studs in the following is set at 7-1/8 in. (181 mm). If necessary, loosen clamping bolt
and position lever so that dimension “c” is as shown when in the neutral detent posi-
tion, and retighten clamping bolt.
b 10°
a
c
a
d
72958
d
50228
Typical Hurth Transmission Shown
a - Shift Lever
b - Shift Lever In Neutral Detent
c - Dimension Between Studs - 7-1/8 In. (181 mm)
d - Clamping Bolt
CAUTION
Avoid severe transmission damage. All ZF/Hurth Transmissions require Standard
Left-Hand rotation engines. NEVER connect a ZF/Hurth Transmission to a
Right-Hand rotation engine.
IMPORTANT: Transmission propeller rotation is determined by the shift cable instal-
lation in the remote control.
•
RIGHT-HAND PROPELLER ROTATION - Control cable will have to be installed in
remote control so that cable end will move in direction “A” when shift handle is placed in
the forward position.
•
LEFT-HAND PROPELLER ROTATION - Control cable will have to be installed in
remote control so that cable end will move in direction “B” when shift handle is placed in
the forward position.
A
B
23242
INDEX
Page 8B-14
90-863161 SEPTEMBER 2000
Product Specification
Categories | Mercury MerCruiser Manuals |
---|---|
Tags | Mercury MerCruiser 496 CID |
Model Year | 1998, 1999, 2000, 2001, 2002, 2003, 2004, 2005, 2006, 2007, 2008, 2009, 2010, 2011 |
Download File |
|
Document File Type | |
Copyright | Attribution Non-commercial |
How many openings for crankcaseventilation is there on
Merc 496 HO ?
Great down load . it was all there an more