CHARGING SYSTEM
SERVICE MANUAL NUMBER 26
11.
Unsolder the three stator leads from the rectifier heat sink. Place a needle nose pliers
on diode terminal between solder joint and diode body to help prevent heat damage to
diodes. Unsolder joints as quickly as possible and allow diode terminal to cool before
removing pliers.
b
a
72827
b
a - Heat Sink
b - Stator Leads (3)
IMPORTANT: With alternator disassembled to this point, stator, rectifier, diodes, and
rotor may be tested, as explained under “Component Testing,” following.
IMPORTANT: DO NOT clamp vise on rotor pole pieces when removing pulley nut (in
next step), as pole pieces may be distorted.
12.
Remove pulley retaining nut by clamping pulley in a vise (using an oversize V-belt or
protective jaws to protect pulley) and turning nut counterclockwise with a 7/8 in. wrench.
Remove lockwasher and slide pulley and fan from shaft. If pulley is difficult to remove,
it may be necessary to use a universal puller.
b
a
72828
a - 7/8 in. Wrench
b - Over-Sized V-Belt To Protect Pulley
INDEX
Page 4C-16
90-861329--1 MARCH 1999
Categories | Mercury MerCruiser Manuals |
---|---|
Tags | Mercury MerCruiser 181 CID |
Model Year | 1998, 1999, 2000, 2001, 2002, 2003, 2004, 2005, 2006, 2007, 2008, 2009, 2010, 2011 |
Download File |
|
Document File Type | |
Copyright | Attribution Non-commercial |
(6 votes, average: 5 out of 5) Marine readers have rated Mercury MerCruiser GM 4 Cylinder 181 cid 3.0L Marine Engines Service Manual Number 26 5.0 out of 5.0 based on 6 product reviews.
Thanks for sharing this material. Helps a lot after suffering with bad mechanics. spend too much money and nothing very good
great manual, makes impossible jobs possible. without a manual you can not do the job, a must have.
Great resource. Excellent information provided.
Need help to install automate choke
Need help to instal automate choke