262
CID (4.3L) ENGINES
SERVICE MANUAL NUMBER 25
8.
Balance shaft rear bearing can be replaced using balance shaft removal and installer
tool in conjunction with bearing puller.
a
b
72903
a - Balance Shaft Removal and Installation Tool
b - Bearing Puller
Cleaning and Inspection
1.
2.
Wash balance shaft in solvent and blow dry with compressed air.
Inspect rear bearing for wear or damage. See “Specifications.”
NOTE: Front bearing is not serviceable and may be replaced only with the balance shaft
assembly.
3.
Inspect front bearing for secure fit on shaft or excessive side to side play. Also check
for scored bearings or roughness while rotating.
4.
5.
6.
Inspect front cylinder block bore for scoring or evidence of bearing spinning in bore.
Inspect gears for chips or excessive wear on teeth.
Inspect balance shaft gear key way and shaft dowel pin for excessive wear.
Index
Page 3A-92
90-861328--1 NOVEMBER 1999
Categories | Mercury MerCruiser Manuals |
---|---|
Tags | Mercury MerCruiser 1262 CID, Mercury MerCruiser 262 CID |
Model Year | 1998, 1999, 2000, 2001 |
Download File |
|
Document File Type | |
Copyright | Attribution Non-commercial |
(4 votes, average: 4.5 out of 5) Marine readers have rated Mercury-MerCruiser GM V6 262 CID 4.3L Marine Engines Service Manual Number 25 Sections 1-3 4.5 out of 5.0 based on 4 product reviews.
This is great. I really like it. Thank you for providing this valuable opportunity for me.
if I can get the info that would be great
The information given is enoug .
In my opinion this is the best site on the net. Assisting people to do a job correctly and safely.