2004 Johnson 55 hp WPL 2-Stroke Outboard Owners Manual

ENGINE MAINTENANCE AND INSPECTION SCHEDULE
Routine maintenance is necessary for all mechanized products. Periodic maintenance contributes to the
product’s life span. The following maintenance chart provides guidelines for engine maintenance and in-
spection scheduled to be performed by you and/or by an authorized DEALER. The schedule should be
adjusted according to operating conditions and use.
The recommended lubricants have been formulated to protect bearings, gears and engine components.
They must be used to avoid damage caused by improper lubrication.
IMPORTANT: Schedules for rental operations, commercial applications or high hour use will require
greater frequency of inspection and maintenance.
Engine Maintenance and Inspection Schedule
Frequency
Engine
Care
Product
Description
Tilt lever, tilt lever shaft, swivel bracket,
7
Every 60 days / Every 30 in Saltwater
Every 60 days / Every 30 in Saltwater
(1)
inspect and lubricate
Tilt cylinder upper bushings, tilt bolt
7
(1)
bushings, inspect and lubricate
Cover latches, front and rear, lubricate (1)
Clamp screws, lubricate (1)
7
7
7
Every 60 days / Every 30 in Saltwater
Every 60 days / Every 30 in Saltwater
Every 60 days / Every 30 in Saltwater
Carburetor linkage and timer link, inspect
(1)
and lubricate
Throttle and shift linkage, inspect and
7
Every 60 days / Every 30 in Saltwater
(1)
lubricate
Tilt support bracket, inspect and lubricate (1)
Steering handle and shift lever, inspect and
7
7
Every 60 days / Every 30 in Saltwater
Every 60 days / Every 30 in Saltwater
(1)
lubricate
Lubrication and corrosion protection for
metallic components
4
Every 60 days / Every 30 in Saltwater
Anticorrosion anodes, verify operation
Water intake screens, verify condition
O
O
O
D
D
D
Overboard water pump indicator, verify
operation
Steering friction/system check
O
O
O
D
D
D
Throttle and shift operation, verify function
Emergency stop circuit and lanyard, verify
function
Starter, inspect cord
O
O
O
O
O
D
Flush cooling system
Clamp screws, tighten
Emergency Start Cord, onboard and inspect
Operator’s Guide, onboard
Maintenance - 39
Product Specification
CategoriesBrands / Company Guides, BRP Brand Manuals, Johnson 2-Stroke Manuals, Johnson Brand Manuals, Johnson Outboard Manuals
Tags,
Model Year2004
Download File
Please Enter the Security Characters Shown Below. Letters are Case Sensitive. Your download link will appear upon completing this step.
- 52 pages
Document File TypePDF
CopyrightAttribution Non-commercial
(0 votes, average: 0 out of 5)

Submit your review (optional)
(will not be displayed)
* Required Field

Leave a Reply

Your email address will not be published. Required fields are marked *

*
*
Website