2009 Maxum 3700 SY Sport Yacht Supplement Guide

Chapter 6: Plumbing
Marine Head with Holding Tank
NOTICE
Check with local authorities for regulations regarding the legal use of marine head systems.
Electric Head
Read the marine head
operation and mainte-
nance manual before
using the marine head
for the first time.
HOLDING TANK
SEAWATER PICKUP
& BALL VALVE
MARINE HEAD
The holding tank is
plumbed to a waste fit-
ting on the deck for
dockside pump-out.
Check the content level
of the holding tank by
looking at the side of
the tank.
Empty the holding tank
at every opportunity.
WASTE PUMP-OUT
DECK FITTING
HOLDING TANK
VENT
FILTER
Winterizing The Marine Head
1.
2.
Shut Off the intake seacock, and pump the head until the bowl is dry.
Remove the drain plug in the base and pump again to remove all of the water.
Do not fill the bowl with anti-freeze.
Close the intake seacock while the yacht is underway or whenever the yacht is left moored in the water.
44
Product Specification
CategoriesMaxum Manuals
Tags
Model Year2009
Download File
Please Enter the Security Characters Shown Below. Letters are Case Sensitive. Your download link will appear upon completing this step.
- 80 pages
Document File TypePDF
CopyrightAttribution Non-commercial
(0 votes, average: 0 out of 5)

Submit your review (optional)
(will not be displayed)
* Required Field

Leave a Reply

Your email address will not be published. Required fields are marked *

*
*
Website